2011
16. 8. 2011
EUROVIA CS commenced the construction of Dolní Poustevna –Sewer System and Wastewater Treatment Plant
Drainage of wastewater from the existing estates in Dolní Poustevna and a part of Horní Poustevna shall be solved by construction of the new sewer system. All foul and wastewater from these localities shall be drained to the new wastewater treatment plant (WWTP), which shall be built in Dolní Poustevna. více
27. 7. 2011

